Non-Metallic Hardener | |
The time of application is very important in case of application of the non-metallic floor hardeners. If it is applied too early then it may absorb water and sink. If application is delayed, no moisture from the concrete surface will be available from the concrete to hydrate. Therefore, it should be applied 1-3 hours. |